THE REFERENCE LIBRARY

Understand your home, one system at a time.

Practical explanations with worked examples, checklists and sources.

Insulation

Browse this topic
05

Frost & ground

Browse this topic
04

Wells & water

Browse this topic
11
03
Wells & water

Will a well supply the water your home needs?

Read well logs, understand drawdown and turn flow measurements into pump and storage questions.

Guide · example · useful tools
08
Wells & water

How much rainwater can your roof collect?

Estimate catchment yield, understand storage limits and keep rainwater separate from drinking water.

Guide · example · useful tools
11
Wells & water

Choose a water pipe size without guessing

Connect fixture demand, internal diameter, velocity, pressure loss and pump performance.

Guide · example · useful tools
16
Wells & water

Understand pressure, head and flow in a private water system

Measure static and dynamic pressure, include elevation and read the pump at its operating point.

Guide · example · useful tools
28
Wells & water

Plan household water for a power or supply outage

Separate drinking water from service water, identify electrical dependencies and test a realistic operating plan.

Guide · example · useful tools
30
Wells & water

Diagnose pressure-tank drawdown and rapid pump cycling

Use actual pressures, usable drawdown and observed run times to separate tank, switch, demand and pump problems.

Guide · example · useful tools
31
Wells & water

Use storage to bridge a low-yield well and peak household demand

Separate sustainable source flow, stored volume and delivery pressure before sizing a cistern or break tank.

Guide · example · useful tools
32
Wells & water

Four quick checks for a home water system

Turn pipe dimensions, tank levels, pressure settings and pump run time into four useful commissioning numbers.

Guide · example · useful tools
33
Wells & water

Find and quantify a hidden household water leak

Use the water meter, simple isolation tests and a timed measurement to turn unexplained consumption into a repairable fault.

Guide · example · useful tools
34
Wells & water

Reduce hot-water wait and distribution waste

Measure the water stored between heater and outlet, explain the real wait time and compare compact piping, local heating and controlled recirculation.

Guide · example · useful tools
36
Wells & water

Read a well pumping test before sizing the pump

Keep flow, water level, elapsed time, recovery and intake position together so one attractive number does not hide a weak test.

Guide · example · useful tools

Water treatment

Browse this topic
04

Wastewater

Browse this topic
05

Independent energy

Browse this topic
06

Construction

Browse this topic
09
21
Construction

Estimate a concrete order without hiding the assumptions

Separate drawing dimensions, geometric volume, allowance and supplier constraints.

Guide · example · useful tools
22
Construction

Plan trench quantities without treating excavation as a safe shape

Estimate spoil while keeping utilities, collapse protection, water and access as separate decisions.

Guide · example · useful tools
23
Construction

Size the roof-drainage path from rainfall to safe discharge

Connect roof area and design intensity to gutters, outlets, downpipes and foundation drainage.

Guide · example · useful tools
42
Construction

Measure masonry and screed before ordering materials

Turn drawings and site measurements into transparent quantities without confusing an order estimate with structural or product design.

Guide · example · useful tools
43
Construction

Measure paint and tile quantities before buying

Build a checkable room finish take-off from measured surfaces, declared product coverage and explicit rounding decisions.

Guide · example · useful tools
44
Construction

Measure roof pitch and covering quantities safely

Turn plan dimensions and a verified pitch into a transparent first material quantity while keeping layout and safety decisions separate.

Guide · example · useful tools
45
Construction

Turn roof runoff into a buildable drainage set-out

Carry a design rainfall from the connected roof area through outlet capacity, gutter fall, overflow and final discharge.

Guide · example · useful tools
46
Construction

Plan flooring and wallpaper without hiding waste

Separate measured area, effective product coverage, layout allowance and whole-pack purchasing.

Guide · example · useful tools
47
Construction

Estimate plaster and drywall from a measured layout

Turn a site sketch into reviewable quantities without hiding thickness, product consumption or cutting allowance.

Guide · example · useful tools

Electrical power

Browse this topic
02

Heating

Browse this topic
03