THE CALCULATION BENCH

Small calculations. Better decisions.

Every tool includes units, editable assumptions, an example and a related guide. All calculations run locally in your browser.

Insulation

Browse this topic
07

Wells & water

Browse this topic
22
Wells & water

Rainwater collection & overflow

Estimate one rainfall event and the amount a tank can receive.

Wells & water

Household water demand

Estimate daily use and an explicit buffer-storage volume.

Wells & water

Well drawdown & specific capacity

Interpret water levels from a recorded pumping test.

Wells & water

Pump head & electrical power

Combine lift, delivery pressure and friction in a first-pass pump calculation.

Wells & water

Water velocity in a pipe

Convert flow and internal pipe diameter into water velocity.

Wells & water

Water volume in a round tank

Estimate the water held in a vertical cylindrical tank from its internal dimensions.

Wells & water

Water pressure to head

Convert water pressure into metres of head and psi using a stated density.

Wells & water

Hot and cold water mixing

Estimate hot and cold volumes needed to reach a target mixed-water temperature.

Wells & water

Water stored above a well-pump reserve level

Estimate the cylindrical water column and volume above a protected pump-intake level.

Wells & water

Observed well water-level recovery

Convert a measured rise in a cylindrical well into equivalent volume and an average recovery observation.

Wells & water

Rainwater storage balance for a dry period

Compare usable tank water with expected demand and dependable inflow over a chosen period.

Wells & water

Bladder pressure-tank drawdown estimate

Estimate the water delivered between pump cut-out and cut-in pressures from a precharged bladder tank.

Wells & water

Well-pump cycle-rate screening

Estimate one pressure-tank draw-and-refill cycle under a steady water demand below pump capacity.

Wells & water

Well supply and peak-demand buffer

Compare a measured source flow and usable stored water with one defined period of peak household demand.

Wells & water

Water volume inside a pipe

Calculate how many litres a straight pipe run holds from its internal diameter and length.

Wells & water

Tank fill time with simultaneous demand

Estimate how long a tank takes to reach capacity when water is entering and may also be used.

Wells & water

Pressure-tank nominal size from required drawdown

Estimate the nominal bladder-tank volume needed to provide a chosen usable drawdown between switch pressures.

Wells & water

Water lost through a leak

Turn an observed leak flow and daily duration into water volume and an estimated bill impact.

Wells & water

Hot-water wait time and wasted water

Estimate how long cooled water must run before hot water arrives, plus the daily and annual water sent to the drain.

Wells & water

Well specific-capacity and pumping-level screen

Turn one stabilized pumping observation into specific capacity and a cautious linear screen for another flow.

Wells & water

Rainwater first-flush volume

Estimate the initial roof runoff to divert before sending rainwater toward storage.

Wells & water

Gravity-tank water pressure at an outlet

Estimate the pressure available from the lowest tank water level after elevation and entered flow losses.

Independent energy

Browse this topic
15
Independent energy

Generator running & starting load

Check one documented motor start against other running loads.

Independent energy

Daily electricity budget

Add three appliance groups using power and actual daily running time.

Independent energy

Solar array energy balance

Estimate DC array size from daily energy and a monthly solar assumption.

Independent energy

Battery autonomy

Convert a daily load into nominal battery capacity with stated losses.

Independent energy

Energy to heat water

Estimate heat and input energy for a known water volume and temperature rise.

Independent energy

Shower water, energy and running cost

Estimate water use, water-heating energy and combined operating cost for a household shower pattern.

Independent energy

Battery recharge time

Estimate ideal recharge time between two states of charge.

Independent energy

Generator fuel runtime

Convert usable stored fuel and measured consumption into a simple operating-time estimate.

Independent energy

Solar energy balance over a low-sun period

Compare estimated solar production with critical-load demand over several days.

Independent energy

Generator-assisted battery recharge plan

Estimate recharge time, generator-side demand and fuel for a stated battery deficit.

Independent energy

Battery autonomy after load shedding

Compare battery runtime before and after reducing the daily critical-load budget.

Independent energy

Pump electricity use and operating cost

Estimate electricity and cost from measured input power, daily run time and a chosen period.

Independent energy

Hot-water recirculation energy and cost

Estimate annual pump electricity and the energy needed to replace heat lost from a hot recirculation loop.

Independent energy

Hot-water tank recovery time

Estimate the energy, cost and ideal time needed to heat a stored volume between two temperatures.

Independent energy

Usable hot-water storage

Estimate the mixed-water volume, shower time and stored heat available from a hot-water tank.

Frost & ground

Browse this topic
04

Wastewater

Browse this topic
06

Water treatment

Browse this topic
05

Construction

Browse this topic
16
Construction

Concrete volume and order allowance

Calculate geometric concrete volume and a separate ordering allowance.

Construction

Trench excavation volume

Estimate in-place and loosened spoil volumes for a straight trapezoidal excavation.

Construction

Roof runoff peak flow

Estimate peak roof runoff from connected area, rainfall intensity and a runoff factor.

Construction

Pipe bedding and surround material volume

Estimate separate bedding and pipe-surround volumes for one uniform trench segment, including pipe displacement and an order allowance.

Construction

Masonry unit quantity

Estimate blocks or bricks from net wall area, unit face size, joint thickness and an explicit allowance.

Construction

Floor screed volume and bag estimate

Convert measured floor area and average screed thickness into volume and bags using the product’s declared yield.

Construction

Paint quantity and can estimate

Convert measured paintable area, coats and the product’s declared coverage into litres and whole cans.

Construction

Tile quantity and pack estimate

Estimate full tiles, order area and packs from the net surface, tile dimensions and a stated cutting allowance.

Construction

Roof pitch and slope length

Convert a measured rise and horizontal run into pitch angle, slope percentage and sloping length.

Construction

Roof covering area and pack estimate

Convert a simple horizontal roof footprint and pitch into sloping area, order area and whole packs.

Construction

Roof outlet and downpipe count

Convert roof catchment and design rainfall into a preliminary number of rated outlets or downpipes.

Construction

Gutter fall and support set-out

Turn gutter length, intended fall and maximum support spacing into end level and evenly spaced support points.

Construction

Flooring area and pack quantity

Estimate net floor area, layout allowance and whole packs from effective pack coverage.

Construction

Wallpaper area and roll quantity

Estimate wall area and whole rolls using the product’s effective coverage after pattern matching.

Construction

Plaster mix and bag quantity

Estimate dry plaster mix from finished area, average thickness, product consumption and allowance.

Construction

Drywall sheet quantity

Estimate whole boards from net lined area, sheet size and a layout-specific allowance.

Electrical power

Browse this topic
07

Heating

Browse this topic
06